Fire Protection

Share & Bookmark, Press Enter to show all options, press Tab go to next option
Print

Before beginning development, contact your city or county fire department to determine specific fire protection requirements for your project. Skagit PUD offers comprehensive fire flow analysis services to help ensure your development meets these requirements.

Our engineering team can conduct a detailed computer-based hydraulic analysis of the existing water system to:

  • Determine available fire suppression flow rates at your development site
  • Identify whether water system improvements are needed to achieve required fire flow capacity
  • Provide recommendations for any necessary system upgrades

To request a hydraulic analysis, please contact our Engineering Department. Plan for approximately 30 business days for the analysis to be completed. This timeframe allows for thorough evaluation and quality assurance of results.