Judy Raw Water Pump Station Replacement Project - Technical Specifications

September 28, 2020

Download File

Judy Raw Water Pump Station Replacement 
Project No. 3766

Bid Opening: October 20, 2020

Installation of a new raw water pump station with three vertical turbine pumps, split-faced CMU building, metal roof, and associated mechanical appurtenances, electrical equipment, and heating and cooling systems. Site improvements include water yard piping, storm drain modification, chain-link fence, site lighting, final grading, surface restoration, and landscaping restoration.

The engineer’s estimate range for Project # 3766 is $3 - 3.2 million.