Judy Reservoir to Mount Vernon Transmission Pipeline Phase 2 - Pipe Alignment Drone Video

December 2, 2020

(File missing)

Full flight from the south connection point of the transmission line to the Judy Reservoir water treatment plant.

https://www.youtube.com/watch?v=b9I6qjkXtns