N 18th St, E Division St to Highland Ave and E Fir St, N LaVenture Rd to N 30th St Project - Bid Plans

August 5, 2020

Download File

N 18th St, E Division St to Highland Ave and E Fir St, N LaVenture Rd to N 30th St Bid Plans

Bid Opening is August 19, 2020.

The Engineer’s Estimate range for Project # 3760 is $1.5-1.8 million.